Be able to easily change order of bands
As of right now the only way to change the order of bands for a specific show is to delete every one below it, save it, and then add the bands in the correct order. The perfectionist in me wants it to always be the order they played, and for some reason the orders get wonky on this site sometimes.
7
votes
![](http://www.gravatar.com/avatar/4875a71ba77ddf1060b66cf060783ed1?size=40&default=https%3A%2F%2Fassets.uvcdn.com%2Fpkg%2Fadmin%2Ficons%2Fuser_70-6bcf9e08938533adb9bac95c3e487cb2a6d4a32f890ca6fdc82e3072e0ea0368.png)
You can now drag and drop the bands into the correct order :)